Permit Review Context
What matters when scoping Change of Use Plans
A change of use can trigger more than a simple floor-plan update because a new occupancy may change egress, accessibility, plumbing fixture, fire-protection, structural or MEP requirements. The permit scope should be confirmed before construction documents are finalized.
We use these topics to frame the drawing scope, but the final submittal requirements are set by the city, county or other reviewing authority for the project address.
01change of occupancy permit
02change of use drawings
03existing and proposed occupancy
04life safety analysis
05ADA accessibility review
06egress and occupant load
07commercial code review
08tenant improvement coordination